Preplanning essentially sets a realistic scope for the project at an early stage before a large investment in design
fees is committed. This service is set up to examine a proposed project and make recommendations as to the best way
to make the execution of that project go smoothly.
|
|
The exploratory thinking and analysis of the project that this service encourages allows for anticipation of
potential problems and preventative steps can be taken to avoid these issues before the design phase begins.
Preplanning leads to an in-depth analysis of the proposed project, not to an advanced design solution.
|
 |
|
Financial limitations are set during the preplanning process and any necessary financing for the project is
sought. The natural culmination of the preplanning services could lead to the production of a master plan for
future improvements.
|
|
If there are existing facilities, forensic architectural reports are developed to identify strengths and
weaknesses of the structures. This service is an important component of the preplanning process.
|
| |